The Palmas Academy

The Palmas Academy

Client: The Palmas Academy

Service Offered: Post Hurricane Restoration

Project Location: Palmas del Mar, Humacao, PR

Year Completed: 2018

Post Hurricane Restoration

Post Hurricane Restoration

Client: PHA

Service Offered: Post Hurricane Clean up

Project Location: Palmas del Mar, Humacao, PR

Year Completed: 2017

Parroquia La Sagrada Familia

Parroquia La Sagrada Familia

Client: Parroquia La Sagrada Familia

Service Offered: Post Hurricane Restoration

Project Location: Palmas del Mar, Humacao, PR

Year Completed: 2018

Beach Bohio

Beach Bohio

Client: Palmas del Mar Properties

Service Offered: Post Hurricane Clean up

Project Location: Palmas del Mar, Humacao, PR

Year Completed: 2018

Aerostar Airport Holdings LLC. – Vehicular Gate 2

Aerostar Airport Holdings Vehicular Gate 2

Client: Aerostar Airport Holdings, LLC

Service Offered: Design Build

Project Location: Luis Muñoz Marín International Airport, Carolina, PR

Construction Area: 750 sq. ft.

Year Completed: 2021

PCD was awarded a Design & Build contract for the installation of Atlantic Anti Ram Crash Beams to secure access to the airport airfield and runways and improve security at the Luis Muñoz Marín International Airport.


PCD was also awarded a Design & Build contract for the renovation of the Vehicular Gate #2 at the Luis Muñoz Marín International Airport. The scope of work includes the interior and exterior renovations of the guard house structure including the relocation of the bathroom, installation of bulletproof window, lighting fixtures, and doors.

Plastic Surgery Institute

Plastic Surgery Institute

Client: Plastic Surgery Institute

Designer: Shieh García Atelier, LLC

Service Offered: Construction

Project Location: Miramar, San Juan, PR

Construction Area: 2,325 sq ft

Construction Status: Completed

PCD was awarded a construction contract for the renovation and expansion of the medical offices of the Plastic Surgery Institute located in Miramar, San Juan, PR. The scope of work includes the interior renovations and expansion of the facility.

Shell Castle 40

Shell Castle 40

Client: Doug Strecker

Service Offered: Design Build

Project Location: Palmas del Mar, Humacao, PR

Construction Area: 330 sq. ft.

Year Completed: 2021

PCD was contracted for Design and Build services of a single family residence in Palmas del Mar. The scope of services combined design and construction of the renovation work of the residential project, including the installation of the intermediate floor structure using the Spanish Colonial methodology, skylight structure for the living room expansion, renovation of bathrooms, replacement of kitchen fixtures, cabinets doors and finishes, as well as changes in windows to comply with the current Building Codes.

Casa Sabai

Casa Sabai

Client: Pavarini Land Development, Inc.

Designer: Pavarini Construction Development, LLC

Service Offered: Design Historic Restoration

Project Location: Bayamón, PR

Construction Area: 87,440 sq ft

Construction Status: In Progress

Casa Sabai is planned to be a full service luxury living residence. The philosophy of Casa Sabai is to provide a confortable resort style environment that offers a broad variety of amenities for residents to enjoy activities suited to their interest and abilities. The property is located in park liked surroundings with generous gardens that enjoy a year round tropical climate.

Luma College for Technical Training

Luma College for Technical Training

Client: LUMA College for Technical Training

Designer: Pavarini Construction Development, LLC

Service Offered: Design Build

Project Location: San Isidro Industrial Park, Canóvanas, PR

Construction Area: 22,874 sq ft

Year Completed: 2023

PCD has been selected to design and build the LUMA College for Technical Training, which will be a training school for LUMA Energy LLC employees. The facility design is complete, and construction is scheduled to begin immediately after approval of construction permits at the San Isidro Industrial Park facility in Canóvanas.

The campus includes three primary buildings. The main building will have classrooms and offices for administrative services. A second structure will have a laboratory that simulates a power distribution network with load banks for practical training for participants. A third structure will serve as a warehouse for equipment and materials in support of the other structures. The training program will be complemented by a practical training area, with power poles, transmission lines, towers and training wells.

The main building is 9,900 square feet that contain 10 offices, two classrooms, a study room, reception, lobby, and student areas. The training laboratory area is 6,400 square feet with a simulated power distribution grid and load banks. The equipment storage building in the complex is a 5,900 square foot warehouse with open areas and uncovered areas. The total project development covers approximately 10 acres.

Vista Verde Phase 2

Vista Verde Phase 2

Client: Pavarini Land Development, Inc.

Service Offered: Development & Design Build

Project Location: Naguabo , PR

Construction Count: 200 housing units

Construction Status: In Progress

PCD is offering assistance to numerous families that were affected by Hurricanes Irma or María to apply for Housing Assistance for the R3 Relocation Program. These applicants are interested in acquiring replacement housing at the Vista Verde Urbanization, which is being developed by Pavarini Land Development, Inc. and is under construction by Pavarini Construction & Development, LLC. PCD has staff fully dedicated to the effort that will be ongoing through the coming months for qualifying hurricane survivors.

The proposed Vista Verde Phase 2 house design has been improved to meet the amended Building Codes that includes the latest standards for earthquake and hurricane wind loads. The Phase 2 housing units includes two models: two bedroom units or three bedrooms units, an open space concept design, two bathrooms and a new façade design. The house also includes provision s for a water cistern, a solar water heater, and a photovoltaic system. The electrical system offers the option to connect a portable generator as a backup option to the public power grid. Gas piping has been incorporated in the design to allow the homeowner the alternative of gas cooking and a gas clothes dryer.

PCD finalized its Design for Resilient Housing intended for the Community Development Block Grant Disaster Relief (CDBG DR 2018) Housing Relocation Program (R3 Program) for families that suffered losses caused by hurricanes Irma or María. This new resilient design incorporates features that improve the structures’ ability to survive both seismic and hurricane events; and to also maintain the serviceability of the houses following such events. The Vista Verde housing development was approved by the Puerto Rico Housing Authority to be included in the New Construction Project Based Voucher Program under the R3 Reconstruction Program. The housing development has been included in the New Construction Housing Catalog for eligible applicants for the R3 Reconstruction Program.